Earned Value Management (EVM)

Know where the project really stands.

EVM turns progress into the numbers that don't lie — Planned Value, Earned Value and Actual Cost, CPI and SPI, cost and schedule variance — measured to the data date and drawn as a live S-curve.

app.buildops.io / evm
Earned Value Management (EVM) — BuildOps
CPI / SPI
cost & schedule performance, at a glance
S-curve
PV · EV · AC, cumulative to the data date
1 report
branded Earned Value report, on demand
The metrics that matter

Earned value, without the spreadsheet gymnastics.

BuildOps derives every EVM figure straight from your WBS progress and actuals — no parallel model to maintain.

📐

Planned Value (PV)

The budgeted cost of work scheduled, to the data date.

Earned Value (EV)

Budgeted cost of work actually completed — progress in money terms.

💸

Actual Cost (AC)

What you've really spent, pulled from integrated actuals.

CPI & SPI

Cost and schedule performance indices — over or under, at a glance.

📊

Variances

Cost variance and schedule variance, by line and in total.

📄

Branded report

An Earned Value report in your Legal Entity's identity, on demand.

BuildOps AI · Variance Insights

Your S-curve, explained.

An index below 1.0 tells you there's a problem — it doesn't tell you why. Variance Insights reads the curve, points to the lines driving the overrun, and puts the story in plain English, so the bad news never arrives as a surprise.

  • Explains what's driving cost & schedule variance
  • Points to the specific lines pulling performance down
  • Plain-English narrative for status reports
  • Surfaces the trend before it becomes a crisis
AI Variance Insights
S-curve

The shape of progress, to the data date.

Planned, earned and actual, drawn as cumulative curves over time — so you see not just where you are, but the trajectory you're on, and whether the gap is opening or closing.

  • PV, EV and AC as cumulative S-curves
  • Measured precisely to the project data date
  • Cost & schedule gaps visible at a glance
  • Drill from the curve into the lines beneath it
Earned Value Management — S-curve

Put your projects on the curve.

We'll run EVM on your WBS and show you CPI, SPI and the AI variance story on real numbers.